The Assembly and Testing of New Energy Gearbox


        The assembly and testing line of new energy gearbox consists of assembly line, testing line and repair area.


        Technical features:
        High degree of automation so that few workers are needed. High Production efficiency. The silent friction power free conveyor is adopted in the assemble line, and via simulating the preload installing force, the quality of gasket is pre-tested at the measurement station. Two End of Line (EOL) tow testbenches are deployed in the assembly line, and each of them is equipped with 3 servo motors. What is more, the common DC bus technique is also applied to feedback energy to power grid when testing gearboxes. All of these methods are now achieving the domestic leading level. During the whole assembling process, together with both pre- and post-assembling tasks, comprehensive monitoring on the mechanic and electrical aspects is conducted in order to guarantee the quality consistency of each product.